
Forged to
hold what matters.
47 locking pliers and C-clamp models — drop-forged CR-V steel, heat treated, nickel plated, 100% inspected. Straight from our Nantong floor to your warehouse.
We make it.
We ship it.
NANTONG LAIE CO., LTD · Est. 30 Apr 2024 · Nantong, Jiangsu
Laie is a manufacturing-and-trading house: hardware, metal tools and pneumatic & power tools we build ourselves; metal products, forming machines, furniture, textiles, building materials and e-bike parts we trade.
With goods and technology import-export licensing and agency capability, we serve buyers who want one partner for many categories.
Locking pliers · C-clamps
LockingWoodworking Straight Jaw Adjustable Extended Long Nose Locking Plier
View details →
LockingSelf Adjusting 45° Jaw Extended Long Nose Locking Plier
View details →
LockingVise Grip Plier Wrench, CRV, 3-Nail Oval Jaws
View details →
LockingRubber Handle Extended Long Nose Straight Jaw Locking Plier
View details →
C-Clamp10
View details →
C-Clamp6
View details →Six links,
all under control.
From steel to container — every node has an owner and a record.
Own factory, source pricing
Manufacturing and trading under one roof — full control from raw material to finished goods.
47 live models, fast delivery
Tooling and semi-finished stock on hand — 15–25 days for standard models.
100% inspection, traceable batches
Hardness, torque and plating checked per batch, with inspection reports.
OEM / ODM customization
Drawing-based development, logo printing, color-box packaging and private label.
Export documents & logistics
Import-export agency license, FOB / CIF terms, familiar with EU, US and Middle East requirements.
One-stop hardware sourcing
Tools, metal products, machines, building materials and textiles sourced in one order.
A good plier comes down to three things: jaw bite, hinge play, plating life. We answer all three with testing, batch after batch.
Four steps to delivery
Inquiry
Models, quantity, packaging — FOB / CIF within 24 hours.
Sampling
3–5 days for standard, 7–10 days for custom.
Production
15–25 days with per-batch hardness, torque and plating tests.
Shipping
In-house licence, Shanghai port, documents and logistics included.
From the shop floor.
Product updates, certifications and shipping news, published from the CMS.